The existing building was a ground floor plus four and rooftop industrial building that had undergone several transformations in its lifespan. The most relevant change took place in 2003, when the building experienced a total renovation shifting its use from industrial to office space. The communications and service cores were modified to fulfill the standing regulations disregarding the resulting conditions in the workspace. The building occupied almost all of the lot’s surface, generating very deep spaces with hardly any natural light or ventilation. The rooftop was devoted exclusively for machinery.
The project now adds different strategies to upgrade the building’s existing conditions. A new tiered green patio improves lighting and ventilation of interior spaces. The tiered section improves lighting to all levels and generates terraces that extend the work areas with new meeting and working spaces. A staircase is added to the patio, strengthening the connection between floors and fostering healthy habits. Vegetation becomes the main character of most exterior areas, fostering biodiversity and generating biophilic spaces.
The ground floor is understood as an extension of the street, relating directly with the main elevation and access to the building. The main lobby is designed as a multifunctional space incorporating different elements of the program—a bicycle parking and front desk at the building’s main entrance, an auditorium and foyer directly linked to the entrance, and a green patio as a backdrop.
The flexible workspace is placed on the four floors organised around the new central patio, fostering relation with the terraces and vegetation. The floor-plans are arranged with a large open central space hosting the workspace and two lateral stripes, placed along the building’s party walls and hosting vertical communication cores, hygiene chambers, closed meeting rooms and offices, and resting areas. The new productive and dynamic rooftop generates exterior meeting and production spaces. It has two main areas—the main terrace linked with the central courtyard, and the main elevation hosting the living and meeting spaces lushly planted and protected by mobile awnings. Features such as the photovoltaic panel pergola and mobile canopies improve the space’s comfort attributes. The other area is destined to the building’s technical services, taking advantage of existing elements such as the metal pergola to add photovoltaic panels.
The project is developed according to the following sustainability criteria:
FACTFILE
Client: MSF – Médecins Sans Frontières
Authors: Batlle i Roig Arquitectura, Enric Batlle, Joan Roig, Albert Gil
Team: Miriam Aranda, Annabel Barba – Architects /Joan Batlle – Landscape Architect / Diana Calicó, Elisabeth Torregrosa – Building Engineers / Dolors Feu – Agriculture Engineer and Landscape Designer
Project partners: STATIC Ingenieria SA – Structural Engineering / PGI Engineering – MPE Engineering / Dos54 – Facade Consulting Builder: Vesta Rehabilitación S.L.
Area: 8,230 sq m
Year of completion: 2019
Text: Provided by the Architects
The family home designed by reD Architects captures a modern essence with adaptable spaces and…
In the heart of Savannah, Georgia, where history whispers through cobblestone streets and grand oak…
For Keith Menon, co-founder of Spiro Spero, design transcends mere aesthetics; it’s an art form…
In the world of conservation, Vikas Dilawari is a name that resonates with reverence. “Imagine…
With a legacy of excellence spanning decades, Schueco has become synonymous with innovation, sustainability, and…
Metal pirouettes against gravity, reaching upwards, setting the tone for our rendezvous at architect Sumit…